Factors Necessary for the Development of Hydro-electric Power in India
- Uniform and adequate supply of water to enable a hydro-electric plant to work at full capacity.
- The presence of lakes, which act as natural regulators, is of great help in maintaining regular and constant flow of water.
- Topography: Rapids and falls in mountain regions usually offer very good sites for hydel-power generation.
- Cheap Raw Materials: Availability of cheap raw material like iron ad cement and cheap labour for the construction of hydel-power stations is necessary.
- There should be adequate demand of electric power.
- Need a huge capital as Modern large-scale hydro-projects are expensive
Answered by Social Science Expert | 15 Oct, 2019, 11:05: AM
ICSE 7 - Geography
Asked by miloni77 | 05 Jan, 2024, 07:09: PM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by miloni77 | 19 Dec, 2023, 05:47: PM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by seemadevikaju123 | 29 Jul, 2023, 10:06: AM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by druhigoel2010 | 20 Jul, 2023, 07:18: PM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by riyanamkum | 28 May, 2023, 05:12: AM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by rupamruhi2009 | 14 May, 2023, 11:41: AM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by kandharihimanshi | 18 Apr, 2023, 06:43: PM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by mdatif32 | 15 Jan, 2023, 11:29: AM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by chintapalliswarna | 16 Nov, 2022, 06:51: AM
ANSWERED BY EXPERT
ICSE 7 - Geography
Asked by sarthakpandit1986 | 16 Apr, 2022, 10:46: AM
ANSWERED BY EXPERT