Request a call back

Join NOW to get access to exclusive study material for best results

CBSE Class 12-science Answered

A brick manufacturer has two depots, A and B, with stocks of 30,000 and 20.000 bricks respectively. He receives orders from three builders P, Q and R for 15,000, 20,000 and 15,000 bricks respectively. The cost in Rs of transporting 1000 bricks to the builders from the depots are given below :                  From To P Q R A 40 20 30 B 20 60 40           How should the manufacturer fulfil the orders so as to keep the cost of transportation minimum ? Formulate the above linear programming problem.
Asked by Topperlearning User | 31 Jul, 2016, 06:04: PM
answered-by-expert Expert Answer

A manufacturer can be exhibited diagrammatically as shown in fig

Let the depot A transport x thousands bricks to builders P, y thousands to builder Q. Since the depot A has stock of 30,000 bricks. Therefore, the remaining bricks i.e., 30-(x + y) thousands bricks will be transported to the builder R.

        Since the number of bricks is always a non-negative real number.

        Therefore,

        x > 0, y > 0 and 30 -  (x + y) > 0 x > 0, y > 0 and x + y < 30

        Now, the requirement of the builder P is of 15000 bricks and x thousand bricks are transported from the depot A. therefore, the remaining (15 - x) thousands bricks are to be transported from the depot at B. The requirement of the builder Q is of 20,000 bricks and y thousand bricks are transported from depot A. Therefore, the remaining (20 - y) thousand bricks are to be transported from depot B.

        Now, depot B has 20 -  (15 - x + 20 - y) = x + y - 15 thousand bricks which are to be transported to the builder R.

        Also, 15 - x > 0, 20 - y > 0 and x + y - 15 > 0

         x < 15, y < 20 and x + y > 15

        The transportation cost from the depot A to the builders P, Q and R are respectively Rs 40x, 20y and
(30 - x - y). Similarly, the transportation cost from the depot B to the builders P, Q and R are respectively Rs 20( 15 - x), 60(20 - y) and 40(x + y - 15) respectively. Therefore, the total transportation cost Z is given by

        Z = 40x + 20y + 30(30 - x - y) + 20(15 - x) + 60(20 - y) + 40(x + y - 15)

         Z = 30x - 30y + 1800

        Hence, the above LPP can be stated mathematically as follows :

        Find x and y in thousands which

        Minimize Z = 30x - 30y + 1800

        Subject to

        x + y < 30

        x < 15

        y < 20

        x + y > 15

        and, x > 0, y > 0

 

To solve this LPP graphically, we first convert in equations into equations and then draw the corresponding lines. The feasible region of the LPP is shaded in Fig. 29.25. The coordinates of the corner points of the feasible region A2 PQ B3 B2 are A2 (15, 0) P (15, 15), Q (10, 20), B3 0, 20) and B2 (0, 15). These points have been obtained by solving the corresponding intersecting lines simultaneously.

 

 

 

 

 

The value of the objective function at the corner points of the feasible region are given in the following table

 

 

 

Point (x, y)                                                     Value of the objective function

                                                                         X = 30x - 30y + 1800

 

A2 (15, 0)                                      Z = 30 x 15 - 30 x 0   + 1800 = 2250

P (15, 15)                                      Z = 30 x 15 - 30 x 15 + 1800 = 1800

Q (10, 20)                                      Z = 30 x 10 - 30 x 20 + 1800 =1500               
B3 (0, 20)                                       Z = 30 x 0 - 30 x 20 + 1800 = 1200              

B2 (0, 15)                                       Z = 30 x 0 - 30 x 15 + 1800 = 1350

 

                                                                                                                                   

 

Clearly, Z is minimum at x = 0, y = 20 and the minimum value Z is 1200.                   

 

 

 

Thus, the manufacturer should supply 0, 20 and 10 thousand bricks to builders P, Q and R from depot A and 15, 0 and 5 thousand bricks to builders P, Q and R from depot B respectively. In this case the minimum transportation cost will be Rs 1200                  


Answered by | 31 Jul, 2016, 08:04: PM

Concept Videos

CBSE 12-science - Maths
Asked by gargisha381 | 26 May, 2022, 12:24: PM
ANSWERED BY EXPERT ANSWERED BY EXPERT
Get Latest Study Material for Academic year 24-25 Click here
×